Skip to content
Cleveland National Forest PCT Overnight Permit permit area in Cleveland National Forest - backcountry hiking destination

Cleveland National Forest PCT Overnight Permit

Cleveland National Forest · California

Each entry point carries its own quota

Overnight permit for the Pacific Crest Trail through Cleveland National Forest — the first 110 miles of the PCT, from the Campo terminus through the Lagunas. For trips under 500 miles.

Watch your Cleveland NF PCT dates

A Cleveland NF PCT permit is booked by the day you start. Tell us every date you'd go and we'll ping you the second one of them opens up.

Cleveland National Forest (Pacific Crest Trail overnight) sells no nights here until Mar 1, 2027.

Leave the second date blank if only one day works. A wider window catches more openings.

Party

70% of the openings our scanner caught on Cleveland NF PCT were gone within 5 minutes.

Plan the full trip, not just the permit

Build your full itinerary start to finish

Add your dates and get a day-by-day plan: what needs a permit, what gear to bring, and one link to share with your whole group to coordinate every step.

Start a plan — it's free

No permit needed to start

Cleveland NF PCT Quick Facts

Permit RequiredYes
Booking MethodReservation
Demand LevelHigh7/10
SeasonMarch 1 - May 31
Daily Quota5 people
Max Group Size2 people

Cleveland NF PCT Permit Facts

  • As of September 2026, Cleveland NF PCT in Cleveland National Forest, California requires a permit issued via reservation.
  • Cleveland NF PCT is a high-demand permit, rating 7/10 on PermitSnag's demand index.
  • The permit season for Cleveland NF PCT runs March 1 through May 31.
  • Cancelled Cleveland NF PCT permits are re-released on the booking system; PermitSnag monitors availability and alerts watchers when dates open.

Key Information

Key Dates

SeasonMarch 1 - May 31

Permit Details

TypeOvernight
Booking MethodReservation
Demand Level7/10
LocationSan Diego County, CA

Pro Tips

  • Five people a day in the peak March to May window is the tightest part of this permit. If your start date is fixed, watch for cancellations rather than hoping for a release.
  • Start dates cannot be modified. Changing your start means cancelling and rebooking, and there are no refunds on cancellations.
  • Planning 500 miles or more? Skip this permit entirely and apply through PCTA.org.

How to Get This Permit

1

Create a Recreation.gov account

Sign up at Recreation.gov if you don't have an account. Have your payment info ready.

2

Know the release schedule

Permits typically release on a rolling basis. Check the specific release time for your desired dates.

3

Be ready when permits drop

Log in a few minutes early. Have your dates, group size, and payment ready to go.

4

Monitor for cancellations

If your dates are sold out, people cancel all the time. Set up PermitSnag alerts to catch openings instantly.

Safety & Planning

🚨

Emergency Info

Emergency contacts, ranger station locations, and satellite communicator tips for Cleveland NF PCT. Sign up to track this permit.

🐻

Food Storage

Bear canister requirements, approved container lists, and rental locations for this permit. Sign up to track this permit.

Cleveland NF PCT FAQ

Who needs a Cleveland National Forest PCT overnight permit?

Anyone spending a night on the PCT in the forest on a trip shorter than 500 continuous miles. Longer hikes use the PCTA long-distance permit instead, which the Forest Service links from this same booking page.

How tight is the PCT quota through Cleveland National Forest?

Five people per day from March 1 through May 31, with a maximum group size of two people per permit. Outside that window, June 1 through the end of February, a permit is still required but no limit is placed on how many are issued.

When does the Cleveland National Forest PCT permit quota open?

February 1 for the first permit date of March 1. The quota season runs through May 31, which is precisely the northbound start window, so the five daily slots go quickly.

Do children count against the PCT permit quota?

No. The Forest Service exempts children 12 and younger from the quota, and says they do not need to be included in the permit reservation.

👥Community

Trail Conditions

No active conditions reported

Sign in to report trail conditions.

Questions

No questions yet

Be the first to ask about Cleveland NF PCT.

Trip Reports

Write Report

No trip reports yet

Be the first to share your experience at Cleveland NF PCT.

Write the First Report

A small favor

One tick helps us more than you’d think

Google lets you pick the sites it highlights for you. Add PermitSnag and our permit pages get marked as one of yours in AI Overviews and AI Mode.

Add PermitSnag in Google

Takes less than a minute.