Skip to content
Tuolumne River permit area in Sierra Nevada Rivers - backcountry hiking destination

Tuolumne River Permit

Sierra Nevada Rivers · California

You book a launch date, not campsites

18 miles of Class IV+ granite whitewater below Yosemite on the Main Tuolumne, plus the Class V+ Cherry Creek run above it.

Watch Tuolumne launch dates

You reserve a launch date, not campsites — the rest of the trip follows it downstream. Give us the launches you'd take and the size of your party, and we'll alert you when one frees up.

This permit caps parties at 26.

70% of the openings our scanner caught on Tuolumne were gone within 5 minutes.

Plan the full trip, not just the permit

Build your full itinerary start to finish

Add your dates and get a day-by-day plan: what needs a permit, what gear to bring, and one link to share with your whole group to coordinate every step.

Start a plan — it's free

No permit needed to start

Tuolumne Quick Facts

Permit RequiredYes
Booking MethodFirst-Come, First-Served
Demand LevelModerate6/10
SeasonMay 1 - October 15
Cost$6 reservation fee, plus $2 per person
Daily Quota90 people
Max Group Size26 people

Tuolumne Permit Facts

  • As of September 2026, Tuolumne in Sierra Nevada Rivers, California requires a permit issued via first-come, first-served.
  • The permit season for Tuolumne runs May 1 through October 15.
  • The Tuolumne route covers 18 miles, rated expert.
  • Cancelled Tuolumne permits are re-released on the booking system; PermitSnag monitors availability and alerts watchers when dates open.

Key Information

Key Dates

SeasonMay 1 - October 15

Permit Details

TypeRiver Access
Booking MethodFirst-Come, First-Served
Demand Level6/10
LocationStanislaus National Forest, CA

What to Expect

Route Details

Distance
18 miles
Route Type
Point to Point
Duration
1-3 days
Difficulty
Expert

Highlights

  • 18 miles of Class IV+ on the Main, or nine miles of Class V+ on Cherry Creek
  • A separate permit for each section, even if you run both on one trip
  • Steep single-lane dirt access roads to both the Meral's Pool put-in and the Wards Ferry take-out
  • Flows minimized on every other Wednesday, between 150 and 400 cfs
  • Limited cell service along the river

Best Time to Visit

The permit season runs May 1 through October 15. Flows are minimized every other Wednesday, so check the Groveland Ranger District schedule before you set a date.

Hazards & Considerations

  • !Class IV+ water that the Forest Service rates Class 5 above 5,000 cfs
  • !Cherry Creek at Class V+ to 6 depending on flow, with one recommended portage
  • !Flows that fluctuate rapidly, every day, on the Cherry Creek section
  • !Steep one-lane access roads with few turnouts

Weather Forecast

Trailhead (5,000 ft)

Today

☀️

86°

63°

Thu

☁️

88°

66°

Fri

☁️

84°

61°

Sat

☁️

83°

61°

Sun

☁️

78°

56°

Mon

☁️

76°

54°

Tue

☀️

85°

54°

View full NWS forecast →Mountain weather changes rapidly. This forecast is a guide—always be prepared for worse conditions.

How to Get This Permit

1

Create a Recreation.gov account

Sign up at Recreation.gov if you don't have an account. Have your payment info ready.

2

Know the release schedule

Permits typically release on a rolling basis. Check the specific release time for your desired dates.

3

Be ready when permits drop

Log in a few minutes early. Have your dates, group size, and payment ready to go.

4

Monitor for cancellations

If your dates are sold out, people cancel all the time. Set up PermitSnag alerts to catch openings instantly.

Difficulty Assessment

Physical Demand4/5

Fitness and endurance required

Technical Skill3/5

Climbing, scrambling, or specialized skills

Navigation3/5

Route finding and trail clarity

Commitment4/5

Difficulty of bailing out mid-route

Best For

Experienced hikers with excellent fitness and relevant technical skills.

Recommended Experience

Multi-day backpacking or river experience recommended.

About This Permit

One permit covers one section. The Main Tuolumne is 18 miles of Class IV+ that the Forest Service rates Class 5 above 5,000 cfs, and it runs in one to three days from Meral's Pool to Wards Ferry. Cherry Creek is a nine-mile, one-day Class V+ run with a gradient of 110 feet per mile and a Miracle Mile that drops at over 200 feet per mile. Running both back to back is a four-day trip and needs a permit for each section.

Permits are required from May 1 to October 15 anywhere below the Holm and Kirkwood Powerhouses down to the high water mark of Don Pedro Reservoir. They open on the last Sunday in February and are allocated first-come, first-served right up to midnight the day before a launch.

The Forest Service limits non-commercial boaters to 90 people a day on the river, with 26 per group. A single person may hold no more than four launch date reservations at a time.

Rules & Regulations

  • Permit required May 1 to October 15 below Holm and Kirkwood Powerhouses to the Don Pedro high water mark
  • Non-commercial boaters are limited to 90 people per day on the river
  • Group size is limited to 26
  • One permit per section, and the Main allows up to a 3-day trip
  • Permits open on the last Sunday in February and stay bookable to midnight the day before launch
  • No more than 4 launch date reservations held at one time
  • A no-show may cancel all your remaining reservations for the season
  • Coast Guard approved PFDs at all times, with spares per boat, and helmets for kayakers and everyone on Cherry Creek
  • Each boat carries a spare oar or paddle, a throw line, 20 feet of mooring line, 100 feet of spare line, a first aid kit and a repair kit

Safety & Planning

🚨

Emergency Info

Emergency contacts, ranger station locations, and satellite communicator tips for Tuolumne. Sign up to track this permit.

🐻

Food Storage

Bear canister requirements, approved container lists, and rental locations for this permit. Sign up to track this permit.

Tuolumne FAQ

Do I need one Tuolumne River permit or two?

One per section. A permit authorizes either a single day on Cherry Creek or a trip of up to three days on the Main Tuolumne. Running both means two permits.

How many people can be on the Tuolumne River per day?

The Forest Service limits non-commercial boaters to 90 people per day on the river, with a maximum of 26 people per group.

When do Tuolumne River permits open?

On the last Sunday in February each year. They are first-come, first-served and stay bookable until midnight the day before your launch.

How hard is the Tuolumne River?

The Forest Service rates the Main Tuolumne Class IV+, and Class 5 above 5,000 cfs. Cherry Creek is Class V+ to 6 depending on flow and is described as possibly the most challenging whitewater rafting run in the nation.

👥Community

Trail Conditions

No active conditions reported

Sign in to report trail conditions.

Questions

No questions yet

Be the first to ask about Tuolumne.

Trip Reports

Write Report

No trip reports yet

Be the first to share your experience at Tuolumne.

Write the First Report

A small favor

One tick helps us more than you’d think

Google lets you pick the sites it highlights for you. Add PermitSnag and our permit pages get marked as one of yours in AI Overviews and AI Mode.

Add PermitSnag in Google

Takes less than a minute.